Form · Construction & Infrastructure

Application for a commercial building dispute (QCAT Form 25)

Link to QCAT Form 25 for a commercial building dispute under the Queensland Building and Construction Commission Act 1991. A QBCC dispute-resolution letter is required before a commercial or domestic building application.

Kind
Form. A form to complete, or a guide to completing an official one.
Where it applies
Queensland
AI use
Yellow You and the tool draft together, with you directing. You check every statement you rely on.
Law stated as at
22 October 2026
Status
Maintained. Checked on 22 October 2026 against the official form at qcat.qld.gov.au and the 2 authorities it cites, for Queensland.
Version
1
Source
Link to the official form. Licence: © State of Queensland (Queensland Civil and Administrative Tribunal). Link only: download the current form from the official page each time; do not copy or adapt it.

Where this comes from

The official form is published by qcat.qld.gov.au; this page is a completion guide. Last checked on 2026-10-22.

When to use it

Use when a commercial building dispute is brought in QCAT. The forms page says parties must participate in QBCC dispute resolution before a commercial or domestic building application, and that QCAT cannot accept the application without the QBCC outcome letter.

How AI may be used

AI may check the draft against the current official form and list what is missing; the lawyer settles every statement that will be filed and signs or lodges the form.

AI may

  • Check the draft is the current version of the form and list every blank field or missing attachment
  • Index the documents on the file that the form calls for, with date and author
  • Turn the court's published filing and service steps into a checklist for this matter

AI must not

  • Must not write allegations, grounds, orders or figures in words that will be filed
  • Must not decide jurisdiction, standing or whether a time limit has been met
  • Must not sign, lodge or serve the form

The lawyer checks

  • The dispute is a commercial building dispute, and Form 25 is the application
  • The QBCC outcome letter is with the application
  • The defective or incomplete work schedule is used if the dispute is about that work
  • The current Form 25 is used

Method: how the Green, Yellow and Red levels are decided. This is guidance for planning, not legal advice.

Authorities

Official form

Open the official form. Always use the current version from the issuer. Licence: © State of Queensland (Queensland Civil and Administrative Tribunal). Link only: download the current form from the official page each time; do not copy or adapt it..

Read the full text

More in Construction & Infrastructure

All precedents for Construction & Infrastructure · Tasks and AI use in this area