Deed · Construction & Infrastructure

Deed of novation of a design consultant to a design and construct contractor

Three-party deed transferring a design consultant's appointment from the principal to the D&C contractor: effective date, release and assumption, treatment of pre-novation services, continuing warranties to the principal, design licence, insurance and execution as a deed.

Kind
Deed. A deed that must be executed as a deed.
Where it applies
Australia
AI use
Yellow AI can help in set ways. A lawyer checks specific points before use.
Law stated as at
18 October 2026
Status
Maintained. Checked on 18 October 2026 against the 2 authorities it cites, for Australia.
Version
1
Source
Written for this library

When to use it

Use when a principal has engaged an architect or engineer to develop the design and the D&C contract requires that consultant to be novated to the contractor at contract award or on a set date. Settle it with the consultant appointment and the D&C contract, which usually annexes the agreed form.

How AI may be used

AI may fill the deed from the consultant appointment and the D&C contract and compare it with the agreed form; a lawyer settles the release, the pre-novation liability position and the warranties to the principal.

AI may

  • Fill the parties, dates, appointment details and fee position from the consultant appointment and the D&C contract
  • Compare this deed with the form annexed to the D&C contract and list differences
  • List the design documents delivered before novation from the transmittal register for Schedule 1

AI must not

  • Must not change the allocation of liability for pre-novation services from what the lawyer has settled
  • Must not draft a release that goes beyond the obligations being novated
  • Must not state that the consultant's insurance is in place without a current certificate

The lawyer checks

  • Whether liability for pre-novation services is transferred as if the contractor had always been the client, or kept separate, and that the deed says so clearly
  • The principal keeps the warranties, reliance and design licence it needs if the D&C contract ends
  • Each party executes as a deed, using s 127 or another valid method, and the deed is dated only when all have signed

Method: how the Green, Yellow and Red levels are decided. This is guidance for planning, not legal advice.

Authorities

Read the full text

More in Construction & Infrastructure

All precedents for Construction & Infrastructure · Tasks and AI use in this area