Form · Construction & Infrastructure

Scott schedule for an ACAT building dispute: completion guide

Link to the scott schedule the ACAT civil disputes page says parties may have to lodge when defects are claimed in a building dispute. The link text states no form number. The Word file was not opened. The originating civil application is a different guide.

Kind
Form. A form to complete, or a guide to completing an official one.
Where it applies
Australian Capital Territory
AI use
Yellow You and the tool draft together, with you directing. You check every statement you rely on.
Law stated as at
22 October 2026
Status
Maintained. Checked on 22 October 2026 against the official form at acat.act.gov.au and the 2 authorities it cites, for Australian Capital Territory.
Version
1
Source
Link to the official form. Licence: © ACT Civil and Administrative Tribunal. Link only: download the current scott schedule from the civil disputes page each time; do not copy or adapt it.

Where this comes from

The official form is published by acat.act.gov.au; this page is a completion guide. Last checked on 2026-10-22.

When to use it

Use when an ACAT civil dispute is a building dispute in which defects are claimed, and the civil disputes page requires a scott schedule. Do not use this schedule as the originating application. The tool does not write the defect items.

Used for these tasks

Each task page says how far AI may help with the task and what the lawyer must review.

How AI may be used

AI may check the pack against the current form and list missing documents. The lawyer writes the complaint items, the defect descriptions and any conduct allegations, and checks every filing.

AI may

  • Check the pack against the current official form and list missing documents named on the page
  • Flag when a defects schedule, a review form or a disciplinary application is being used for the wrong dispute
  • List the time limits and lodgement path stated on the page that was opened

AI must not

  • Must not draft complaint items, defect descriptions, contract allegations or conduct allegations
  • Must not draft pleadings, a scott schedule's item text, or a statement of claim
  • Must not sign, file or serve the application

The lawyer checks

  • The originating application is the current civil dispute application, which has its own guide
  • The scott schedule is added when the page's building-defect requirement applies
  • The page's $25,000 example, and agreement to hear a higher claim, are checked against the current jurisdictional rule
  • The court's or tribunal's current index is checked before assuming a generative-AI practice direction applies. None was stated on the page opened for this guide.

Method: how the Green, Yellow and Red levels are decided. This is guidance for planning, not legal advice.

Authorities

Official form

Open the official form. Always use the current version from the issuer. Licence: © ACT Civil and Administrative Tribunal. Link only: download the current scott schedule from the civil disputes page each time; do not copy or adapt it..

Read the full text

More in Construction & Infrastructure

All precedents for Construction & Infrastructure · Tasks and AI use in this area