Build a defects schedule and a demand from the inspection reports

Key facts

Human involvement
YellowClose supervision
How AI is used
Turn the inspection reports into a schedule of location, observed condition, contract specification and the report page. Produce no demand letter.
What the lawyer must review
The demand is a letter the other side may later treat as a claim. The lawyer writes it from the schedule. If the project is federal public work, preserve the Miller Act notice and one-year suit periods in 40 U.S.C. § 3133 where a payment-bond claim is also in view. A defects claim on a private project is the contract plus the project state’s limitation and repose statutes, which must be opened for that state. Formal Opinion 512: do not send a generated statutory citation that has not been opened. Federal Rule of Evidence 702 is the standard if an expert will later testify to the cause or cost.
Written for / version
United States versionUSAU

Who does what

Who does what
RoleWhat they do
AssistancePotential support includes assembling provisional schedules. Confirm the tool’s capability and permitted scope.
LawyerSet the scope, supervise the work closely, verify every part relied on, resolve omissions and exceptions, and approve the exact output.

Checklist

  1. Open each relied-on authority independently. Confirm its existence, current status, proposition and any quotation or pinpoint reference.
  2. Trace every relied-on figure to its source, confirm dates and assumptions, and independently recalculate totals or derived amounts.
  3. Calculate operative dates independently from the current rule and actual triggering event. Check exceptions and record the verified deadline.
  4. Review operative clauses in the complete document, including definitions, cross-references, schedules and inconsistencies with the instructions.
  5. Check the specialist’s assumptions, qualifications and limits. Obtain the relevant expert or specialist review before relying on a technical conclusion.
  6. Verify the applicable jurisdiction and the version of each relevant law, rule or instrument in force at the material time.
  7. Confirm the output against the client’s instructions and the complete relevant source material, including omissions or contradictions.
  8. Resolve exceptions and record the responsible lawyer’s approval of the exact output and intended use.