Draft green or transition loan KPI schedules aligned with the Singapore-Asia Taxonomy
The responsible lawyer reviews the work against the instructions, sources and intended use.
You and the tool draft together, with you directing. You check every statement you rely on.
- Written for / version
- Singapore versionAlso written for: United States
What Green, Yellow and Red mean
- Green · Lawyer review
- The tool writes the first draft inside a template you have already tested. You check it. Without that test, first drafting starts at Yellow.
- Yellow · Close supervision
- You and the tool draft together, with you directing. You check every statement you rely on.
- Red · Lawyer-led
- You write the text. The tool writes nothing into the document.
The task in detail
Review and AI use
What the lawyer must review
Verify the green activity thresholds and the amber transition thresholds against the Singapore-Asia Taxonomy for Sustainable Finance. Check the facility against the MAS Guidelines on Environmental Risk Management for Banks (December 2020) and the March 2026 transition planning addendum. That addendum takes effect in September 2027.
Check that any margin change still works if an external verifier withholds assurance, or if a transition threshold expires.
How AI is used
Draft initial sustainability performance targets, reporting schedules and margin ratchet mechanics from the agreed term sheet and technical consultant report.
Who does what
Who does what
| Role | What they do |
|---|---|
| Assistance | Potential support includes preparing preliminary structure or wording and assembling provisional schedules. Confirm the tool’s capability and permitted scope. |
| Lawyer | Set the scope, supervise the work closely, verify every part relied on, resolve omissions and exceptions, and approve the exact output. |
Checklist
Checklist
- Confirm the output against the client’s instructions and the complete relevant source material, including omissions or contradictions.
- Resolve exceptions and record the responsible lawyer’s approval of the exact output and intended use.