Review a project deed for a bid or a dispute by comparing the risk clauses

Key facts

Human involvement
YellowClose supervision
How AI is used
List how the deed allocates delay, defects, payment security, changes, and termination, quoting each clause. Do not score the bid or write a qualification.
What the lawyer must review
No public-private partnership statute was opened. The deed is read as a contract. If the project is a federal public building or work, 40 U.S.C. § 3131 is the bond requirement and § 3133 is the claimant’s action on the payment bond, including the 90-day and one-year periods that section states. If it is an agency construction contract, 31 U.S.C. § 3905 requires the 7-day subcontract payment clause and the interest-penalty clause, and it states that a payment dispute between contractor and subcontractor under those clauses is not a dispute to which the United States is a party. The lawyer decides whether either statute applies. Formal Opinion 512: the table is checked before it is used in a bid or a pleading.
Written for / version
United States versionUS

Who does what

Who does what
RoleWhat they do
AssistancePotential support includes preparing preliminary structure or wording. Confirm the tool’s capability and permitted scope.
LawyerSet the scope, supervise the work closely, verify every part relied on, resolve omissions and exceptions, and approve the exact output.

Checklist

  1. Trace every relied-on figure to its source, confirm dates and assumptions, and independently recalculate totals or derived amounts.
  2. Review operative clauses in the complete document, including definitions, cross-references, schedules and inconsistencies with the instructions.
  3. Verify the applicable jurisdiction and the version of each relevant law, rule or instrument in force at the material time.
  4. Confirm the output against the client’s instructions and the complete relevant source material, including omissions or contradictions.
  5. Resolve exceptions and record the responsible lawyer’s approval of the exact output and intended use.