Prepare a variation or extension-of-time claim from the site records

Key facts

Human involvement
YellowClose supervision
How AI is used
From the contract, site diaries, programmes and correspondence, draft a variation or EOT claim with a chronology, clause references and a list of missing records.
What the lawyer must review
  • Check notice and time-bar clauses; missing them is fatal
  • Check the claim against the actual clause and contemporaneous records
Written for / version
US

Open a jurisdiction version of this task to see which instruments apply: US

Who does what

Who does what
RoleWhat they do
AssistancePotential support includes preparing preliminary structure or wording and summarising source material. Confirm the tool’s capability and permitted scope.
LawyerSet the scope, supervise the work closely, verify every part relied on, resolve omissions and exceptions, and approve the exact output.

Checklist

  1. Calculate operative dates independently from the current rule and actual triggering event. Check exceptions and record the verified deadline.
  2. Review operative clauses in the complete document, including definitions, cross-references, schedules and inconsistencies with the instructions.
  3. Verify dates, people and sequence against contemporaneous records. Preserve uncertainty and identify gaps or conflicting accounts.
  4. Review the original source set for relevant material absent from the output, including contrary evidence, qualifications and remaining gaps.
  5. Confirm the output against the client’s instructions and the complete relevant source material, including omissions or contradictions.
  6. Resolve exceptions and record the responsible lawyer’s approval of the exact output and intended use.