title: "Victorian domestic building warranties schedule"
url: "https://ailawframework.com/precedents/construction-and-infrastructure/vic-domestic-building-warranties"
type: "precedent"
site: "AI Law Framework"
id: "a11-vic-domestic-building-warranties"
area_id: "A11"
kind: "checklist"
ai_level: "yellow"
version: 1
task_ids: ["A11-X20260927-6"]
law_stated_as_at: "2026-10-22"
---

# Victorian domestic building warranties schedule

> Schedule of the implied warranties Consumer Affairs Victoria states for domestic building work, and the 10-year period it attributes to the Building Act 1993.

Canonical page: https://ailawframework.com/precedents/construction-and-infrastructure/vic-domestic-building-warranties  
Law stated as at: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

- Kind: Checklist. Steps or checks to work through and tick off.
- Practice area: [Construction & Infrastructure](https://ailawframework.com/precedents/construction-and-infrastructure.md)
- Jurisdictions: Victoria
- AI level: Yellow. You and the tool draft together, with you directing. You check every statement you rely on.
- Law stated as at: 2026-10-22
- Status: Maintained. Checked on 2026-10-22 against the authority it cites, for Victoria.

## When to use it

Use when listing the statutory warranties to check against a Victorian domestic building defect. It does not decide whether the work breached a warranty or whether a claim is in time.

## Used for these tasks

- [Build the statutory warranty and liability cut-off schedule for a residential building claim](https://ailawframework.com/practice/construction-and-infrastructure/build-the-statutory-warranty-and-liability-cut-off-schedule-for-a-reside.md)

## How AI may be used

AI may place each defect against a warranty heading from the inspection report. It must not decide that a warranty was breached or that the 10-year period has expired.

**AI may:**

- List defects from an inspection report under the warranty headings on the page
- Enter the completion date supplied in the file and count 10 years as a candidate end date
- Flag a contract clause that says the warranties are excluded

**AI must not:**

- Must not decide that work was or was not done in a proper and workmanlike manner
- Must not decide that the Building Act period has ended
- Must not draft the defects claim or a statement of the owner

**The lawyer checks:**

- The 2025 amending Act is checked for commencement before the list is relied on
- The completion date is taken from a document, not from a recollection in the instruction
- The page's 10-year statement is checked against the current Building Act section

## Authorities

- [Consumer Affairs Victoria, Implied warranties on home building work (read 22 October 2026), linking Domestic Building Contracts Act 1995 version 093](https://www.consumer.vic.gov.au/licensing-and-registration/builders-and-tradespeople/running-your-business/warranties-and-insurance/implied-warranties-on-home-building-work)

## Full text and drafting notes

The full text and the drafting notes are not part of this public page. Signed-in firm accounts can read them at https://ailawframework.com/precedents/construction-and-infrastructure/vic-domestic-building-warranties and through the signed-in MCP connector https://ailawframework.com/mcp/firm.

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*