# Queensland direction to rectify record

> Record of a QBCC direction to rectify: who it was issued to, the period stated in the direction, and the consequences the Commission publishes for not complying.

Canonical page: https://ailawframework.com/precedents/construction-and-infrastructure/qld-direction-to-rectify-record  
Law stated as at: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

- Kind: Checklist. Steps or checks to work through and tick off.
- Practice area: [Construction & Infrastructure](https://ailawframework.com/precedents/construction-and-infrastructure.md)
- Jurisdictions: Queensland
- AI level: Red. You write the text. The tool writes nothing into the document. Where permitted, it may check, clarify or collect data, and anything it checks or collects is verified.
- Law stated as at: 2026-10-22
- Status: Maintained. Checked on 2026-10-22 against the authority it cites, for Queensland.

## When to use it

Use when a licensed contractor has received, or expects, a direction to rectify from the Queensland Building and Construction Commission. The response to the direction is written separately.

## Used for these tasks

- [Respond to a regulator order to rectify serious defects in an apartment building](https://ailawframework.com/practice/construction-and-infrastructure.md#A11-L20261018-5)

## How AI may be used

AI may enter the direction's date, the licensee named, and the period printed on the direction. It writes none of the response.

**AI may:**

- Enter the direction number, date, licensee and the period printed on the direction
- List photographs, contracts and variation records by date and description
- Flag a direction whose stated period ends within the next 7 days

**AI must not:**

- Must not draft the response to the direction
- Must not admit or deny that work is defective
- Must not describe the cause of a defect or draft a witness statement

**The lawyer checks:**

- The period is the period stated in the direction, not an assumed 35 days
- The dollar penalties on the Commission page are checked against the current penalty before they are quoted
- Any internal review is taken from the review pages, which were not used here

## Authorities

- [Queensland Building and Construction Commission, Direction to rectify (last published 30 June 2025)](https://www.qbcc.qld.gov.au/non-compliance/consequences-non-compliance/direction-rectify)

## Full text and drafting notes

The full text and the drafting notes are not part of this public page. Signed-in firm accounts can read them at https://ailawframework.com/precedents/construction-and-infrastructure/qld-direction-to-rectify-record and through the signed-in MCP connector https://ailawframework.com/mcp/firm.

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*