---
title: "Request for a decision by default, unliquidated damages (QCAT Form 50)"
url: "https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-50-default-unliquidated"
type: "precedent"
site: "AI Law Framework"
id: "a11-form-qld-qcat-50-default-unliquidated"
area_id: "A11"
kind: "form"
ai_level: "yellow"
version: 1
task_ids: ["A11-T1-R5"]
law_stated_as_at: "2026-10-22"
---

# Request for a decision by default, unliquidated damages (QCAT Form 50)

> Link to QCAT Form 50. The forms page says unliquidated damages arise when a claim is for a sum which cannot be determined without the tribunal considering the applicant's evidence.

Canonical page: https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-50-default-unliquidated  
Law stated as at: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

- Kind: Form. A form to complete, or a guide to completing an official one.
- Practice area: [Construction & Infrastructure](https://ailawframework.com/precedents/construction-and-infrastructure.md)
- Jurisdictions: Queensland
- AI level: Yellow. You and the tool draft together, with you directing. You check every statement you rely on.
- Law stated as at: 2026-10-22
- Status: Maintained. Checked on 2026-10-22 against the official form at qcat.qld.gov.au and the 2 authorities it cites, for Queensland.

## When to use it

Use when a QCAT claim is for unliquidated damages and the applicant asks for a decision by default. A minor-debt default request is a different form. Evidence in support is prepared by the lawyer.

## Used for these tasks

- [Build a defects schedule and draft the demand from the inspection reports](https://ailawframework.com/practice/construction-and-infrastructure/build-a-defects-schedule-and-draft-the-demand-from-the-inspection-report.md)

## How AI may be used

AI may check the draft against the current official form and list what is missing; the lawyer settles every statement that will be filed and signs or lodges the form.

**AI may:**

- Check the draft is the current version of the form and list every blank field or missing attachment
- Index the documents on the file that the form calls for, with date and author
- Turn the court's published filing and service steps into a checklist for this matter

**AI must not:**

- Must not write allegations, grounds, orders or figures in words that will be filed
- Must not decide jurisdiction, standing or whether a time limit has been met
- Must not sign, lodge or serve the form

**The lawyer checks:**

- The claim is for unliquidated damages, as the forms page describes that term
- Form 50 is the request, and the proceeding is not a minor-debt default
- The applicant's evidence is prepared by the lawyer
- The current Form 50 is used

## Authorities

- [Queensland Civil and Administrative Tribunal, Forms](https://www.qcat.qld.gov.au/resources/forms)
- [Form 50](https://www.qcat.qld.gov.au/__data/assets/pdf_file/0020/100829/form-50-req-for-decision-unliquidated-damages.pdf)

## Official form

[Official form](https://www.qcat.qld.gov.au/resources/forms)

## Where this comes from

The official form is published by qcat.qld.gov.au; this page is a completion guide. Last checked on 2026-10-22.

## Full text and drafting notes

The full text and the drafting notes are not part of this public page. Signed-in firm accounts can read them at https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-50-default-unliquidated and through the signed-in MCP connector https://ailawframework.com/mcp/firm.

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*
