# Build the statutory warranty and liability cut-off schedule for a residential building claim

> Extract the completion, occupancy permit and certificate dates from the documents the lawyer identifies, tabulate each defect item from the inspection reports against the warranty period the lawyer has assigned to it,…

Canonical page: https://ailawframework.com/practice/construction-and-infrastructure/build-the-statutory-warranty-and-liability-cut-off-schedule-for-a-reside  
Last reviewed: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

| Fact | Value |
| --- | --- |
| Practice area | [Construction & Infrastructure](https://ailawframework.com/practice/construction-and-infrastructure.md) |
| Human involvement | Red: Lawyer writes; AI may check, clarify or collect data |
| How AI is used | Extract the completion, occupancy permit and certificate dates from the documents the lawyer identifies, tabulate each defect item from the inspection reports against the warranty period the lawyer has assigned to it, and flag every item whose source date is missing or inconsistent across the documents. The tool does not classify a defect or settle a date. |
| What the lawyer must review | Classify each defect and fix the trigger date yourself against the primary document, then check every barred and near-barred item before advising. |
| Written for / versions | 1 jurisdiction versions below |

## Checking plan

**Lawyer-led judgement**

The lawyer makes the substantive assessment. Any permitted AI assistance remains supporting work with its own checks.

- What the AI does: Extract the completion, occupancy permit and certificate dates from the documents the lawyer identifies, tabulate each defect item from the inspection reports against the warranty period the lawyer has assigned to it, and flag every item whose source date is missing or inconsistent across the documents. The tool does not classify a defect or settle a date.
- What the lawyer does: Classify each defect and fix the trigger date yourself against the primary document, then check every barred and near-barred item before advising.
- Who reviews: Responsible lawyer with competence in the matter
- Basis: Practical workflow informed by the linked primary sources; the traffic light and working checks are editorial guidance, not a court classification.
- Why: The level reflects what the work is, the consequence of an error, and how much of the output the lawyer must independently re-derive.
- Restriction: The lawyer makes the substantive assessment. Any permitted AI assistance remains supporting work with its own checks.

## Checks the lawyer makes

1. Confirm the instructions, the jurisdiction and the complete relevant material before starting.
2. Classify each defect and fix the trigger date yourself against the primary document, then check every barred and near-barred item before advising.
3. Check the output against the source documents named in it before it is relied on.

## Notes

- These are suggested working checks. Confirm the required checking with the responsible lawyer before work starts; the checking approach does not establish permission to use AI.

## Sources

- [https://classic.austlii.edu.au/au/legis/nsw/consol_act/hba1989128/s18e.html](https://classic.austlii.edu.au/au/legis/nsw/consol_act/hba1989128/s18e.html) (checked 2026-09-27)
- [https://classic.austlii.edu.au/au/legis/vic/consol_act/ba199391/s134.html](https://classic.austlii.edu.au/au/legis/vic/consol_act/ba199391/s134.html) (checked 2026-09-27)
- [https://constructlaw.com.au/understanding-the-7-implied-statutory-warranties-in-schedule-1b-of-the-qbcc-act/](https://constructlaw.com.au/understanding-the-7-implied-statutory-warranties-in-schedule-1b-of-the-qbcc-act/) (checked 2026-09-27)

## Forms and precedents for this task

| Form or precedent | Kind | AI level | Summary |
| --- | --- | --- | --- |
| [Building and construction dispute (State Administrative Tribunal): completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-sat-building-dispute.md) | Form | Yellow | Link to the SAT building and construction page. Applications are made through eCourts. The page also publishes a questionnaire, a complaint schedule and a claim schedule.… |
| [Residential building defects notice and claim letter (statutory warranties, NSW)](https://ailawframework.com/precedents/construction-and-infrastructure/residential-defects-notice-and-claim-letter-nsw.md) | Letter | Yellow | Owner's letter to a builder giving written notice of defects under s 18BA of the Home Building Act 1989 (NSW), identifying the s 18B statutory warranties breached, offering access to rectify and… |
| [Application for a domestic building dispute (QCAT Form 26)](https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-26-domestic-building.md) | Form | Yellow | Link to QCAT Form 26 for a domestic building dispute under the Queensland Building and Construction Commission Act 1991. The same QBCC dispute-resolution letter is required before the application. |
| [Residential building dispute application (TASCAT): completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-tascat-residential-building.md) | Form | Yellow | Link to the TASCAT residential building disputes general application, named on the types-of-applications page for section 59 of the Residential Building Work Contracts and Dispute Resolution Act… |
| [Residential building review (TASCAT section 58 form): completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-tascat-building-review-s58.md) | Form | Yellow | Link to the TASCAT residential building application to review a decision of the Director, named for section 58 on the types-of-applications page. The link text states no form number.… |
| [Victorian domestic building warranties schedule](https://ailawframework.com/precedents/construction-and-infrastructure/vic-domestic-building-warranties.md) | Checklist | Yellow | Schedule of the implied warranties Consumer Affairs Victoria states for domestic building work, and the 10-year period it attributes to the Building Act 1993. |
| [Scott schedule for an ACAT building dispute: completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-acat-building-scott-schedule.md) | Form | Yellow | Link to the scott schedule the ACAT civil disputes page says parties may have to lodge when defects are claimed in a building dispute. The link text states no form number.… |
| [Alleged defective or incomplete work schedule (QCAT)](https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-defective-work-schedule.md) | Form | Yellow | Link to QCAT's alleged defective work and incomplete work schedule, for domestic and commercial building disputes under the Queensland Building and Construction Commission Act 1991. |

Signed-in accounts can read the full text of each one.

## Jurisdiction versions

| Jurisdiction | Level |
| --- | --- |
| [United States](https://ailawframework.com/practice/construction-and-infrastructure/build-the-statutory-warranty-and-liability-cut-off-schedule-for-a-reside/united-states.md) | Yellow |

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*