# Build a notice register from the construction contract and the correspondence

> From the notice clause and the correspondence the lawyer designates, list each required notice, the trigger, the contractual time, and the date a notice was sent or received.

Canonical page: https://ailawframework.com/practice/construction-and-infrastructure/build-a-notice-compliance-register-from-the-contract-and-correspondence/united-states  
Last reviewed: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

| Fact | Value |
| --- | --- |
| Practice area | [Construction & Infrastructure](https://ailawframework.com/practice/construction-and-infrastructure.md) |
| Human involvement | Green: AI drafts, lawyer checks |
| How AI is used | From the notice clause and the correspondence the lawyer designates, list each required notice, the trigger, the contractual time, and the date a notice was sent or received. |
| What the lawyer must review | The register is an index. The lawyer checks each date against the document before anyone relies on it. On a federal public-works contract, a payment-bond claimant who has no direct contract with the contractor must give written notice to the contractor within 90 days from the last labor or material, and a civil action on the bond must be brought no later than one year after the last labor or material (40 U.S.C. § 3133). Those periods are not the contract’s notice periods. Formal Opinion 512: verify any generated date or statutory reference. |
| Written for | United States |
| Applies to | [Build a notice-compliance register from the contract and correspondence](https://ailawframework.com/practice/construction-and-infrastructure/build-a-notice-compliance-register-from-the-contract-and-correspondence.md) |

## Checking plan

- What the AI does: From the notice clause and the correspondence the lawyer designates, list each required notice, the trigger, the contractual time, and the date a notice was sent or received.
- Basis: Checked against the linked sources on 22 October 2026. Confirm the current instrument before reliance.

## Notes

- Private projects and state public projects use the project state’s mechanic’s-lien and prompt-pay statutes. Do not copy the Miller Act periods onto them.
- There is no national security-of-payment adjudication. Do not treat the register as an adjudication timetable.

## Sources

- [ABA Formal Opinion 512, Generative Artificial Intelligence Tools (29 July 2024)](https://www.americanbar.org/content/dam/aba/administrative/professional_responsibility/ethics-opinions/aba-formal-opinion-512.pdf) (checked 2026-10-22)
- [40 U.S.C. § 3133, rights of persons furnishing labor or material](https://www.law.cornell.edu/uscode/text/40/3133) (checked 2026-10-22)
- [ABA Model Rule 1.1, Competence](https://www.americanbar.org/groups/professional_responsibility/publications/model_rules_of_professional_conduct/rule_1_1_competence/) (checked 2026-10-22)

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*