# Build a defects schedule and a demand from the inspection reports

> Turn the inspection reports into a schedule of location, observed condition, contract specification and the report page. Produce no demand letter.

Canonical page: https://ailawframework.com/practice/construction-and-infrastructure/build-a-defects-schedule-and-draft-the-demand-from-the-inspection-report/united-states  
Last reviewed: 2026-10-22

Site index for agents: https://ailawframework.com/llms.txt

## Key facts

| Fact | Value |
| --- | --- |
| Practice area | [Construction & Infrastructure](https://ailawframework.com/practice/construction-and-infrastructure.md) |
| Human involvement | Yellow: Lawyer and AI draft together |
| How AI is used | Turn the inspection reports into a schedule of location, observed condition, contract specification and the report page. Produce no demand letter. |
| What the lawyer must review | The demand is a letter the other side may later treat as a claim. The lawyer writes it from the schedule. If the project is federal public work, preserve the Miller Act notice and one-year suit periods in 40 U.S.C. § 3133 where a payment-bond claim is also in view. A defects claim on a private project is the contract plus the project state’s limitation and repose statutes, which must be opened for that state. Formal Opinion 512: do not send a generated statutory citation that has not been opened. Federal Rule of Evidence 702 is the standard if an expert will later testify to the cause or cost. |
| Written for | United States |
| Applies to | [Build a defects schedule and draft the demand from the inspection reports](https://ailawframework.com/practice/construction-and-infrastructure/build-a-defects-schedule-and-draft-the-demand-from-the-inspection-report.md) |

## Checking plan

- What the AI does: Turn the inspection reports into a schedule of location, observed condition, contract specification and the report page. Produce no demand letter.
- Basis: Checked against the linked sources on 22 October 2026. Confirm the current instrument before reliance.

## Notes

- Rule 702 requires the proponent to show it is more likely than not that the expert’s knowledge will help the trier of fact, among the other conditions in the rule. The schedule is not that showing.
- Do not state a repose period. None was opened for a particular state.

## Sources

- [ABA Formal Opinion 512, Generative Artificial Intelligence Tools (29 July 2024)](https://www.americanbar.org/content/dam/aba/administrative/professional_responsibility/ethics-opinions/aba-formal-opinion-512.pdf) (checked 2026-10-22)
- [40 U.S.C. § 3133, rights of persons furnishing labor or material](https://www.law.cornell.edu/uscode/text/40/3133) (checked 2026-10-22)
- [Federal Rule of Evidence 702](https://www.law.cornell.edu/rules/fre/rule_702) (checked 2026-10-22)

## Forms and precedents for this task

| Form or precedent | Kind | AI level | Summary |
| --- | --- | --- | --- |
| [Building and construction dispute (State Administrative Tribunal): completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-sat-building-dispute.md) | Form | Yellow | Link to the SAT building and construction page. Applications are made through eCourts. The page also publishes a questionnaire, a complaint schedule and a claim schedule.… |
| [Residential building defects notice and claim letter (statutory warranties, NSW)](https://ailawframework.com/precedents/construction-and-infrastructure/residential-defects-notice-and-claim-letter-nsw.md) | Letter | Yellow | Owner's letter to a builder giving written notice of defects under s 18BA of the Home Building Act 1989 (NSW), identifying the s 18B statutory warranties breached, offering access to rectify and… |
| [Application for a domestic building dispute (QCAT Form 26)](https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-26-domestic-building.md) | Form | Yellow | Link to QCAT Form 26 for a domestic building dispute under the Queensland Building and Construction Commission Act 1991. The same QBCC dispute-resolution letter is required before the application. |
| [Residential building dispute application (TASCAT): completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-tascat-residential-building.md) | Form | Yellow | Link to the TASCAT residential building disputes general application, named on the types-of-applications page for section 59 of the Residential Building Work Contracts and Dispute Resolution Act… |
| [Scott schedule for an ACAT building dispute: completion guide](https://ailawframework.com/precedents/construction-and-infrastructure/form-acat-building-scott-schedule.md) | Form | Yellow | Link to the scott schedule the ACAT civil disputes page says parties may have to lodge when defects are claimed in a building dispute. The link text states no form number.… |
| [Request for a decision by default, unliquidated damages (QCAT Form 50)](https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-50-default-unliquidated.md) | Form | Yellow | Link to QCAT Form 50. The forms page says unliquidated damages arise when a claim is for a sum which cannot be determined without the tribunal considering the applicant's evidence. |
| [Alleged defective or incomplete work schedule (QCAT)](https://ailawframework.com/precedents/construction-and-infrastructure/form-qld-qcat-defective-work-schedule.md) | Form | Yellow | Link to QCAT's alleged defective work and incomplete work schedule, for domestic and commercial building disputes under the Queensland Building and Construction Commission Act 1991. |
| [Sample terms of settlement (VCAT building and property list)](https://ailawframework.com/precedents/construction-and-infrastructure/form-vic-vcat-sample-terms-building.md) | Form | Yellow | Link to VCAT's sample terms of settlement for the building and property list. The case-type page says parties who reach agreement can use the sample to record what they agreed. |

Signed-in accounts can read the full text of each one.

*Practice guidance for planning and review. Confirm current primary sources and the requirements of the actual matter. This is general information, not legal advice.*